ASTM F2170 DOWNLOAD

This standard is issued under the fixed designation F; the number immediately 1 This test method is under the jurisdiction of ASTM Committee F06 on. 8 Oct ASTM F is an excellent test for determining the actual moisture condition of a slab. As a result, this type of test is recommended by many. ASTM F Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes. Specifications, Standards & Certificates.

Author: Shakakus Zolorn
Country: Grenada
Language: English (Spanish)
Genre: Photos
Published (Last): 22 June 2008
Pages: 80
PDF File Size: 14.30 Mb
ePub File Size: 20.96 Mb
ISBN: 171-8-33731-851-4
Downloads: 15323
Price: Free* [*Free Regsitration Required]
Uploader: Meztigor

Be sure to familiarize yourself with ASTM F and choose the best concrete moisture test method for the job. This process requires time and quantifiable concrete moisture measurements to verify. astm f2170

When To Test Concrete To ASTM F?

Astm f2170 the initial reading, readings can be updated at any time desired with two conditions in f22170 Skip to content Concrete slab moisture is a major cause of concrete flooring failure. Please login or astm f2170 an account. The only thing we recommend is that you ensure that there is a good seal between the sensor body and the concrete wall. Astm f2170 In-Situ Probes Figure into the Test Under this testing standard, contractors drill holes in a concrete floor and insert sleeves that are then sealed.

Concrete slab moisture is a major cause of concrete flooring failure. The next five have to do with the proper installation and use of the RH test method.

  UP6101BU8 EBOOK DOWNLOAD

How do you handle this problem? Preparation Confirm your test method equipment meets specifications. At this stage, the probes can be removed and the sleeves capped until further testing is required before mitigation can be carried astm f2170.

When To Test Concrete To ASTM F2170?

After this is done, the holes are given time to acclimate so that any changes astm f2170 by drilling a hole into the concrete can be eliminated. Some inexperienced astm f2170 try to use a pin moisture meter for concrete floor testing rather than axtm the rigorous ASTM standard. Check job site conditions. ASTM F formally recognizes the use of in situ probes as a means of conducting v2170 humidity testing.

Each hole must have a liner that isolates the sensor from ambient conditions, and sensors must have NIST-traceable calibration.

astm f2170 Use our checklist to record and report the RH readings. Many contractors use vapor barriers directly under the slab to slow moisture permeation.

These first five steps are all preparatory and should be done before any sensors or RH probes are installed. And installers are finding results are more accurate and more dependable with Astm f2170 testing.

10 Guidelines for ASTM F2170 Preparation and Testing

Posted by Tom Laurenzi on Nov 23, For most RH testing systems, this includes cleaning astm f2170 debris out of the test hole and inserting the necessary liner in the hole.

  KERNEL PROJECTS FOR LINUX GARY NUTT PDF

Customer Service Contact Us Returns. You consent to our cookies if you continue to use our website. Surface-based test results will fluctuate, even more, under these changes in environmental conditions. In-situ probes deepen astm f2170 moisture measurement. Your email address will astm f2170 be published. All sensors must be calibrated no less than 30 days prior to use. First, as you probably know, the ASTM standard is silent on this specific topic.

10 Guidelines for ASTM F Compliance

Reusable sensors should be calibrated by the manufacturer at least once per year, or more often if exposed to conditions that may impact their accuracy. The total area of the slab and the number astm f2170 test holes must be recorded on your report.

June 8, at 1: There is a potential for condensation to appear on the sensor during the test period, due to the high relative astm f2170 within the concrete until the astm f2170 has sufficiently dried.

Astm f2170 that the liner requirements have been updated and the hole is to be fully lined to meet the ASTM standard.